Light-duty work
- Blinding
- Sub-floor
- Levelling layer
The right strength class for every project
Grades M100–M600 are produced in accordance with GOST 26633 requirements and undergo 28-day strength testing.
* The final mix design for each project is prepared under laboratory control. Contact us for a price quote.
M is the concrete strength grade (in kgf/cm²), B is the strength class (in MPa). For example, grade M300 corresponds to class B22.5 and has a strength of 22.5 MPa. Both figures are shown on every card. Note: as the GOST class row has no intermediate class, both M500 and M550 correspond to class B40.
The grade depends on the structural load: M100–M150 for levelling and blinding, M200 for floor slabs and general work, M250 for strip foundations and load-bearing walls, M300 for monolithic foundations, slabs and columns, M350 and above for multi-storey frames, and the high-strength grades M500–M600 for industrial, infrastructure and special projects requiring high load-bearing capacity. If you are unsure, our specialists provide free advice.
All grades are produced under laboratory control in accordance with GOST 26633 and undergo 28-day strength testing.